Reconstruction and technical re-equipment of the complex game hall
Reconstruction of the existing covered universal educational and training sports hall provides change of the geometrical sizes on height within an existing building spot.
According to the project, the building consists of the main volume of the universal sports hall (45x24m), the entrance to which is planned at the level of the 2nd floor, which is adjacent to the two-level volume, consisting of a general physical training hall and a four-lane fencing hall. The entrance to the fencing hall is at the level of the 5th floor.
The 1st floor is occupied by the premises of the lobby group, locker rooms and other necessary premises for students, as well as sanitary, administrative, office and engineering facilities.
From the 3rd to the 5th floor there are locker rooms and other necessary rooms for students.
The five-storey volume connects the elevator-stair unit, suitable for the use of MGN.
The general physical training hall is separated from the universal sports hall by a transforming partition, which allows, if necessary, to combine them into one volume.
The
The project was completed in record time.
Project title: Reconstruction of the complex of buildings and structures of the state enterprise "Olympic training and sports center" Koncha-Zaspa "with construction of new structures
Location: 03131, Stolychne Shosse, 19, Kyiv
Customer: SE "Olympic Training and Sports
KONCHA-ZASPA Center
General designer : PNPF "Khersonproekt"
Project stage: EP, P
Design: 2017
The
Plot area: 3729.96 m2
Building area: 1995.19 m2
Floors: 5 floors .
Total area: 4582.35 m2
Construction volume: 38948.76 m2